- Submitted By:
Peter Faase
- Departure Airport: Port Howard (SFPH)
- Arrival Airport: Port Edgar (SFPE)
- Aircraft: DA40 (G-DA40)
- Flight Time: 0.25
- Date Submitted: 07/10/2022
- Status:
Accepted
|
Gross Revenue:
(3 load / $ 50.00 per unit
| $ 150.00 |
Fuel Cost:
(10 fuel used @ 0.78 / unit)
| $ 7.80 |
|